Coventry University

Coventry University

Sector: Industrial

Work elements: New 6.5mw energy centre

Period of works: June 2014 – September 2014

Total time span: 12 weeks including 5 week asbestos strip out

Project value: £2.2m

Overview:

  • 5mw of Heating load
  • Thermal store 34,000 litre
  • BIM model
  • New CHP
  • Revitt Modelling
  • Saving of 489 tonnes of carbon
  • Off site fabrication
  • Temporary boiler plant for hot water
  • 5 new 1200kw boilers
  • New flue system
  • Siemens Bons control
  • 350kw air cooled chiller
  • “Spill and fill” pressurisation units
  • Ongoing water